Cereal Ingredients, Inc.

  • General Contractor: Al J. Mueller Construction
  • Project consisted of the construction of an 80,000 SF tilt-up addition to the existing building allowing food manufacturing to extend their production lines.  This entailed 30 spread footings; +/- 1,150 lf of continuous footing; 5 dock pits; 80,000 sf of slab on grade; and approximately 30,000 sf of exterior paving.