KU Bioscience & Technology Business Center

KU Bioscience & Technology Business Center
  • General Contractor: MarLan Construction
  • Project consisted of a 46,000 sq. ft. addition to an existing structure that remained open for business throughout the entire construction process.  Installation of 18′ architectural site walls (1,000 ln. ft.) which consisted of 153 different, top-of-wall elevations to meet. There were also elevated concrete floors (20,000 sq. ft.), 19′ tall concrete columns, slab on grade, slab on metal deck, architectural concrete site walls, polished/stained concrete, cast in place stairs, one-sided concrete wall, sidewalks, curb & gutter and concrete paving.

Project Photos

DSC01930 (800x600) DSC01982 (800x600) DSC01973 (800x600) DSC01923 (600x800) DSC01925 (800x600) DSC01973 (800x600)DSC01981 (800x600) DSC01964 (600x800)

Skills

Posted on

December 23, 2013